In Transit to Project Site
Last update: 25 Feb 2026 • 15:05 WIB

Shipment Tracking

Shipment Ref: BTM-2026-001734

Shipment Type Project Cargo (Equipment + Spare Parts)
Transport Mode Multimodal (Truck + Sea + Air)
Origin Medan, North Sumatra
Destination Project Site, Gardu Induk PLN Batam – Kep. Riau
Current Activity Final Trucking to Site
ETA Site Delivery 25 Feb 2026 • 16:30 WIB
Project / Client Indonesia Prima Energi – Batam
PIC Receiver (Site) Site Supervisor / Logistics Team

Shipment Progress

Multimodal Movement
Booking & Shipping Instruction
Warehouse Handling & Consolidation
Port / Airport Handling
Main Transit (Sea / Air Freight)
Destination Handling
Final Trucking to Site
Delivered & Handover

Logistics Activity Timeline

Truck • Sea Freight • Air Cargo
25 Feb 2026 • 15:05
TRUCKING
Final Trucking to Project Site — Batam

Pengiriman gabungan cargo utama dan spare part urgent bergerak menuju lokasi proyek untuk unloading di area kerja. Estimasi tiba 16:30 WIB.

25 Feb 2026 • 12:30
AIR CARGO
Air Cargo Received — Hang Nadim Airport, Batam

Spare part kritikal diterima dari penerbangan kargo dan diproses untuk immediate dispatch ke site guna mendukung jadwal instalasi.

25 Feb 2026 • 11:00
PORT HANDLING
Discharge Completed — Port Terminal Batam

Cargo utama (equipment & accessories) selesai dibongkar dari kapal dan dipindahkan ke staging area untuk pengecekan fisik dan dokumen.

25 Feb 2026 • 08:10
SEA FREIGHT
Vessel Berthing — Batam Port

Kapal sandar di terminal pelabuhan tujuan dan menunggu slot bongkar muat sesuai jadwal terminal operation.

24 Feb 2026 • 20:15
SEA FREIGHT
Sea Freight Transit Ongoing

Cargo utama dalam perjalanan laut sesuai shipping plan. Posisi perjalanan dan ETA pelabuhan tujuan masih on schedule.

24 Feb 2026 • 16:40
AIR CARGO
Air Cargo Departed — Kualanamu Airport

Spare part urgent diberangkatkan melalui penerbangan kargo untuk mempercepat kesiapan commissioning / instalasi di site.

24 Feb 2026 • 13:10
PORT HANDLING
Loading to Vessel Completed — Belawan Port

Equipment utama selesai dimuat ke kapal, termasuk securing/lashing, verifikasi packing list, dan konfirmasi manifest pengapalan.

24 Feb 2026 • 09:00
TRUCKING
Trucking from Warehouse — Medan

Armada truk berangkat dari warehouse menuju pelabuhan dan bandara berdasarkan cargo split plan (main cargo vs urgent parts).

23 Feb 2026 • 17:25
WAREHOUSE
Cargo Consolidation & Packaging — Medan Warehouse

Material proyek dikonsolidasikan, dilakukan labeling, pengecekan packing list, dan kesiapan dokumen pengiriman B2B.

23 Feb 2026 • 10:15
DOCUMENTATION
Shipping Instruction Released

Instruksi pengiriman diterbitkan oleh tim operasional. Rute multimoda disetujui: warehouse → trucking → sea/air freight → destination handling → site delivery.